 Emeline Cres-Shower Remodel

Water was leaking from the shower to the closet & kitchen below from behind the faucet wall. Customer had tried to have the leak fixed a few times. They had also tried regrouting and recaulking, but it did not solve the leak. They decided to remodel the shower and after demolition, Schluter waterproofing system was installed on floor & walls. New faucet, prefinished niche and LED light were installed. Polished porcelain tiles were installed on the walls & curb using Raimondi tile leveling system. The glass shower doors were removed and reinstalled. 

Keffer Circle-Bathroom Remodel

Remodel of bathroom. Removed stand in shower, tub/walls, vanity, floor & toilet. Leveled & installed new sub-floor w/Schluter uncoupling membrane. Rigid foam insulation installed on 2 exterior walls. Waterproofed shower area with Schluter Kerdi Board wall panels. Installed 12"x24" tiles on shower walls using Perfect Level Master tile leveling system. 6"x6" patterned tiles on floor. Mosaic tiles in shower floor with Schluter pan/drain assembly. 2 way shower faucet with rain shower head. Low 3" curb with glass doors. Fold up seat & Schluter SHELF-E. All tiled edges finished with Schluter Rondec Brushed Chrome. Tiled baseboards throughout finished with Schluter SCHIENE Brushed Chrome. Led lighting with Panasonic lighted bath fan. 

Drakefield Rd-Load bearing wall removal.

Drakefield before.jpg
Drakefield after.jpg

Removed 2 walls, one load bearing & one non-load bearing to create an open concept kitchen & living area. 22' double LVLs installed in attic space flush with ceiling. 

© 2018 by Edan Home Repair & Contracting. 

  • w-facebook